Deliverable N°
|
Deliverable name |
Dissemi-
|
|
|||
|
D2.1.
|
Note 1
-Task a:
Individual notes by DGC,: REPSOL and NTUA on
adapted software solution for the database
-Task b
(Definition of the data base and form of the
database) |
CO |
|
|||
|
D2.2 |
Task j
Database
|
PU |
|
|||
|
D2.3 |
Report including all findings and a public
summary of the WP2 activities
Task c:
Data
gathering from the existing test data
from DK;
Task e:
Document rules for accepting, refusing
data from third parts
Task d:
form to gather data from the manufacturers
Task
f Document specifications of the data base as
“stand alone “tool (NTUA)
Task
g/h Development of the database management,
Publication of the database
Task i
(Test of the database) |
CO |
|
|||
|
Complete set of interfaces adapted to the
different target groups/
Part 1
(one for each user type).
Complete set of interfaces adapted to the
different target groups/
Part 2
(one for each user type). |
PU |
|
||||
|
|
WP report with the findings of the WP including
the details of the interface and survey among
the target group (after test of WP4) |
PU |
|
|||
|
|
-Note by DGC (commented by all) on definition
and specifications of the software, taking into
account the different target groups.
-Document that describes in a few pages the
present calculation procedure and the algorithms
used for BOILSIM (DGC).
-Document with all default values for the case,
where not all BOILSIM parameters are known:
(DGC). |
PU |
|
|||
|
D4.2.
|
Website |
PU |
|
|||
|
Questionnaire sheet to assess the website (by
DGC). |
PU |
|
||||
|
D4.4 |
Test and evaluation note by DGC with input from
NTUA; REPSOL, CATIM |
CO |
|
|||
|
|
WP report with the findings of the WP |
PU |
|
|||
|
A document for the BEDAC with a proposal of how
to use the database for the market surveillance
|
PU |
|
||||
|
Specific documents for the different
stakeholders that would elaborate on the
possible model for the future maintenance of the
database. |
PU |
|
||||
|
A questionnaire and results that will be
addressed to the relevant identified
stakeholders |
PU |
|
||||
|
A note will be prepared that will summarizes the
actions taken and results achieved for this
specific WP. It will propose a model to run the
tool after the project and include a list of all
agreements reached and possible sponsors to the
project |
PU |
|
||||
|
WP report with the findings of the WP |
PU |
|
||||
|
D6.1 |
-
Designing instructions for the testing of the
tool, designing an answer sheet with the user
comments, critics and remarks.
-
Identification and agreement with a number of
companies that will have to test the interactive
tool on the internet and reply to a
questionnaire.
DGC (10) REPSOL (20), NTUA (10), CATIM (20). |
CO |
|
|||
|
D6.2 |
-Note on the testing at least 10 different
places covering the target groups.
-Synthesis note of the testing: by CATIM |
CO |
|
|||
|
WP report with the findings of the WP |
PU |
|
||||
|
D7.1 |
Note for the overall strategy for the
dissemination
|
CO |
|
|||
|
Document gathering all assembled articles and
documents. |
PU |
|
||||
|
Three articles in English that should cover
different target groups |
PU |
|
||||
|
National translation of the above and
publication in different countries (Finding
adapted magazines in the different countries
involved).
|
PU |
|
||||
|
Folder |
PU |
|
||||
|
|
Summary of all the actions taken during Phase 1
of WP7. (list of articles that were written, to
whom they were addressed, contacts and
corporation that were established and the number
of languages in which the articles were
translated)
Summary of all the actions taken during Phase 2
of WP7. (list of organisations contacted,
agreements or results achieved, workshop
participation, results etc.) |
PU |
|
|||
|
WP report with the findings of the WP |
PU |
|
||||
|
Workhop |
PU |
|
||||
|
|
|
|
|
|
|
|