Deliverable N°

(note that only public deliverables can be downloaded)

Deliverable name

Dissemi-
nation level

CO: Confidential

PU:  Public

 

D2.1.

 

Note 1

-Task a: Individual notes by DGC,: REPSOL and NTUA on adapted software solution for the database

-Task b (Definition of the data base and form of the database)

CO

 

 D2.2

see www.boilerinfo.eu

Task j Database

 

PU

 

D2.3

Report including all findings and a public summary of the WP2 activities

Task c: Data gathering from the existing test data from DK; Spain, Greece. +  data from CE reports(see further)

Task e: Document rules for accepting, refusing data from third parts

Task d: form to gather data from the manufacturers

Task f Document specifications of the data base as “stand alone “tool (NTUA)

Task g/h Development of the database management, Publication of the database

Task i (Test of the database)

CO

 

D3.2 pt1

D3.2 pt2

Complete set of interfaces adapted to the different target groups/ Part 1 (one for each user type).

Complete set of interfaces adapted to the different target groups/ Part 2 (one for each user type).

PU

 

D3.3

 

WP report with the findings of the WP including the details of the interface and survey among the target group (after test of WP4)

PU

 

D4.1.

 

-Note by DGC (commented by all) on definition and specifications of the software, taking into account the different target groups.

-Document that describes in a few pages the present calculation procedure and the algorithms used for BOILSIM (DGC).

-Document with all default values for the case, where not all BOILSIM parameters are known: (DGC).

PU

 

D4.2.

see www.boilerinfo.eu

Website

PU

 

D4.3

Questionnaire sheet to assess the website (by DGC).

PU

 

D4.4

Test and evaluation note by DGC with input from NTUA; REPSOL, CATIM

CO

 

D4.5

 

WP report with the findings of the WP

PU

 

D 5.1

A document for the BEDAC with a proposal of how to use the database for the market surveillance

PU

 

D 5.2

Specific documents for the different stakeholders that would elaborate on the possible model for the future maintenance of the database.

PU

 

D 5.3

A questionnaire and results that will be addressed to the relevant identified stakeholders

PU

 

D 5.4

A note will be prepared that will summarizes the actions taken and results achieved for this specific WP. It will propose a model to run the tool after the project and include a list of all agreements reached and possible sponsors to the project

PU

 

D 5.5

WP report with the findings of the WP

PU

 

D6.1

-          Designing instructions for the testing of the tool, designing an answer sheet with the user comments, critics and remarks.

-          Identification and agreement with a number of companies that will have to test the interactive tool on the internet and reply to a questionnaire. DGC (10) REPSOL (20), NTUA (10), CATIM (20).

CO

 

  D6.2

-Note on the testing at least 10 different places covering the target groups.

-Synthesis note of the testing: by CATIM

CO

 

  D6.3

WP report with the findings of the WP

PU

 

D7.1

Note for the overall strategy for the dissemination

CO

 

D7.2

Document gathering all assembled articles and documents.

PU

 

D7.3

Three articles in English that should cover different target groups

PU

 

D7.3b

National translation of the above and publication in different countries (Finding adapted magazines in the different countries involved).

 

PU

 

D7.4

Folder

PU

 

D7.5a

 

 

 

 

D7.5b

Summary of all the actions taken during Phase 1 of WP7. (list of articles that were written, to whom they were addressed, contacts and corporation that were established and the number of languages in which the articles were translated)

Summary of all the actions taken during Phase 2 of WP7. (list of organisations contacted, agreements or results achieved, workshop participation, results etc.)

PU

 

D7.6

WP report with the findings of the WP

PU

 

D7.7

Workhop

PU